Construction Schedule Board Late Afternoon Iran in on an active construction deck in Iran

Construction Schedule Board Late Afternoon Iran

by Noel Reynolds

Dappled sunlight falls through overhead foliage, casting shifting patches of gold and shadow across a white finish-schedule sample board resting on a metal railing. The board displays rows of printed text and small color swatches, their edges softened by the humid late-summer air that rests on the surface. Behind the board, unfinished glazing frames the bright sky, revealing the skeletal steel and concrete of an active construction deck in Iran. Dust mutes the colors of the swatches, while rain has left the metal railing slightly damp and reflective. A wooden beam leans against the structure nearby, its grain visible under the warm, low-angle light that defines the late afternoon hour.

0
5 views
construction board sample swatches Iran architecture dappled light unfinished building late afternoon metal railing glazing
Camera iPhone SE (2022)*AI-imagined, not shot. For real iPhone SE (2022) photos, grab one online.
Lens 28mm f/1.8
Focal Length 28mm
Aperture f/1.8
Shutter Speed 1/250
ISO 1600
Film shot with manual phone controls
Location on an active construction deck in Iran
Date 2023-06-17
Credit VEETER
Coordinates 32.4850, 53.7799
<a href="https://img.veeter.com/construction-schedule-board-late-afternoon-iran"><img src="https://cdn.veeter.com/img/construction-schedule-board-late-afternoon-iran" alt="Construction Schedule Board Late Afternoon Iran in on an active construction deck in Iran"></a>

Free to download. CDN hosting requires a link back to this page. Terms

Comments